Typical Sections for Placement of Single and Multi-Column SignsĪdded Note 8 and Highlighted sign dimensions for CASE X for clarification. Clearance dimension in the TYPICAL INSTALLATION detail.Ĭorrected the 'FL' Bars Callout to 'FC' in the DRILLED SHAFT: ELEVATION and PLANS details. Guardrail Transitions and Connections for Existing Bridgesĭeleted Note 6 Corrected Index reference in SCHEME 1.Īluminum Post and Pedestal Mounted Pedestrian Detectors and signalsĬorrected all pole callouts to match pole callouts in the PEDESTAL MOUNTED detail.Ĭorrected the Min. Sheet 4: Correct reference in the Legend and the dimension in the SKEWED PIPE PLAN detail.Ĭorrected dimensions in the RAILING DETAIL. Sheet 3: Corrected dimension reference in Note 1. Straight Concrete Endwalls-Single Multiple Pipe ![]() Utility Conflict Thru Drainage StructuresĬorrected dimensions in the CONDITION II-SIDE ELEVATION to show the dimensions to the outside diameter of the Steel Sleeve.Ĭorrected the General Notes and Table of ContentsĬorrected Dimension "C" to "A" in the Elevation view in the ROUND CORRUGATED PIPE detail. Sheet 6: Correct the rebar location in Section R-R and corrected dimension in Section Q-Q.Ĭorrected callouts for the "Grate" location and deleted the "Slot" callout in the DITCH BOTTOM INLET TYPE C-TRAVERSABLE detail.Ĭorrected dimension in the FRONT ELEVATION detail.Ĭorrected note reference to (See Note 1) in the YARD DRAINS-ELEVATION Details.Ĭorrected the dimension in the SLAB REINFORCEMENT detail. Sheet 5: Correct the rebar location in Section N-N and corrected dimension in Section M-M. Sheet 4: Correct the rebar location in Section J-J and Corrected dimension in the Plan View. Sheet 3: Correct the rebar location in Section E-E. Sheet 2: Corrected the rebar location in Section B-B. Two-Lane Roadway, Lane Closure Using Temporary Traffic SignalsĬlarified "Arrow Board" for the Shadow Vehicle in the WORK IN TRAVELED WAY- TWO-LANE ROADWAY, LANE CLOSURE detail.Ĭorrected Right Shoulder Closed sign reference Corrected spelling in Note 1.Ĭorrected typographical error in TABLE 4.Ĭorrected dimension in SECTION A-A and the MANHOLE MODIFICATION details.Ĭorrected dimensions in TYPE 1 INLET - SECTION A-A and the TYPE 2 INLET - SECTION B-B details.Ĭorrected dimensions in the DIMENSIONAL AND REINFORCEMENT - SECTION A-A details. Two-Lane, Two-Way Work Within The Travel WayĬhanged the Shoulder Taper from L/3 to 25'-50'. In the PLAN VIEW in the TEMPORARY LANE SEPARATOR details. ![]() Sheet 7: Clarified CHANNELIZING DEVICES NOTE for paved shoulders less than 4' Sheet 8: Corrected the Table reference in Notes 2, 5, and 6 Corrected the Sheet reference in the DROP-OFF CONDITION DETAIL. General Information for Traffic Control Through Work Zones ![]() The only action required by the user is to replace any copies of affected sheets (listed below) that were downloaded prior to the Errata Date.Ĭorrected the Flexible Pavement Thickness Transition dimension alignment.Ĭorrected dimension in the THREE THRU LANES-APPROACH AUXILIARY LANE detail. The Standard Plans Indexes on the website have been updated to contain the Errata listed below.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |